ПОРТФОЛИО ПРОЕКТОВ

25 января 2025 г.

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

IDesign, Procurement, Construction and Commissioning of PE/PP pipeline extrusion facility in Turkmenabat.

 

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

  • Range of produced diameters 20-630mm

  • Total covered Area 3360m2

  • Capacity of production 1200kg/hour

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

25 января 2025 г.

Construction of engineering networks of 10 Yyl Abadanchylyk Street from Ankara Street to B.Annanova Street.

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

25 января 2025 г.

Design and construction of water pipeline system of the 3rd stage of the Olympic Town in Ashgabat 2016.

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

25 января 2025 г.

Reconstruction of the olympic city's water lines with a total length of 7km,  Ø530-630mm in Ashgabat:

  1. On Ataturk Street from Kipchak Street to Oguzhan Street

  2. Turkmenbashi street from 10 Yyl Abadanchylyk Street to Yashlyk Street) 

  3. 3Hodja Ahmed Yasavy (from B.Ananov to Bitarap Turkmenistan shyoly)

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

  • 7000m of pipes

  • Ø530-630mm Diameters used 

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

25 января 2025 г.

IConstruction of 432 MW (ISO condition) simple cycle gas turbine power plant

Installation and commissioning  of gas pipeline between AGRS and turbines

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

  • TIG/MIG Welding Processes

  • Over 3000 WDI of welding works

  • Over 350 welding joint 

  • Over 3000m of pipes installed 

  • ASME 31.1, 31.1

  • 98%  NDT success rate

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

25 января 2025 г.

Construction of a water treatment plant for a supply of 50,000m3 of portable water per day.  Installation of 100km  pipeline  in the village of Mukry Koytendag Etrap Lebap Welayat.

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

  • 50,000m3 of portable water being supplied 

  • Over 100km of pipelines installed

  • Over 300 people employed 

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

25 января 2025 г.

Removal of the reservoir and water supply network within the streets of A.Niyazov, Bitarap Turkmenistan and Gorogly in Ashgabat

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

25 января 2025 г.

ICRemoval of water and sewerage networks from the Beatarap Turkmenistan Shayaly construction zone in Ashgabat

 

(Water Supply Network of bitarap Turkmenistan - Oguzkhan streets) 

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

25 января 2025 г.

Relocation of the water and sewer systems out of the construction zone of the pedestrian crossing at the junction of A. Niyazov-Turkmenbashi

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

25 января 2025 г.

Reconstruction of the water supply system on N.Pumma Street and Ch. Narimov Street in Ashgabat

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

25 января 2025 г.

Reconstruction of the water pipeline from water treatment unit to Choganly in Ashgabat 

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

25 января 2025 г.

Removal of the water pipeline from the construction zone of the transport interchange in the area of the bridge crossing over the Karakum River north of the city of Gyami

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

25 января 2025 г.

  • Electification of wells on Horosan St. Serahs 

  • Electification of wells on the street "Sh.Durda" Etrap Serahs 

  • Electification of wells on Mollamurt Street etrapa Serahs 

  • Electification of wells on Magtymguly Street etrapa Serahs.

  • Electification of wells on D/B "O.Salyr" etrap Serahs

  • Electification of wells on D/B "Bereket" etrapa Serahs

  • Electification of wells on D/B "A.Tekaeva" etrap Serahs

  • Electification of wells on Bugdayly Etrap Serahs

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

25 января 2025 г.

Intra-site water network of water treatment unit of Seydi city

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

  • 12,000 of pipes installed 

  • Over 50 people installed

МУНИЦИПАЛЬНОЕ ЗДАНИЕ

25 января 2025 г.

Reconstruction of the water pipeline of  Seidi city from water treatment unit to Point A, Road 2 

МУНИЦИПАЛЬНОЕ ЗДАНИЕ